1,、新的或長期停用的的電機,,使用前應(yīng)檢查繞組間和繞組對地絕緣電阻,,并應(yīng)在電機冷卻狀態(tài)下測量,。
Should be checked before new or long-term disabled motor Hangzhou lifting platform, using inter-winding and winding in...
1、重慶升降平臺溢流閥壓力調(diào)節(jié)不符合要求調(diào)整壓力到要求值,。
1, Hangzhou lifting platform overflow valve pressure regulation does not meet the requirements of adjusting the pressure to the desired value.
2,、升...